Find where your site uses freshwater, where treated water can do the same job and how much supply you need on your busiest day. Aeonitya works with industrial plants, campuses and AI data centres to turn those answers into operating decisions.
Start with the decision in front of you. Each service can be commissioned on its own or as part of a wider water programme.
Water Efficiency & Usage Audit
We trace water from the incoming meter through production, cleaning, cooling and discharge. A night-flow reading or an unexplained gap between two meters can identify where the next measurement will be most useful. We separate measured flows from estimates and check how demand changes with output.
You receive a site water balance, a map of gaps in metering and a ranked list of savings opportunities with the evidence needed to confirm each one.
Water Recycling & Reuse Feasibility
A steady effluent stream may have a use on the same site. We match available flows to a specific demand, such as cooling-tower makeup or washdown, then check timing, water quality, storage and the route between the two. Where quality is uncertain, we define what needs testing.
You receive a shortlist of source-to-use matches, treatment and segregation requirements, and a brief for sampling or pilot trials where needed.
Industrial Cooling & Utility Water Optimisation
Cooling towers lose water through evaporation and blowdown. Boilers can lose both water and heat when condensate never makes it back. We compare makeup readings with utility loads and operating logs, then review possible changes with the people responsible for equipment reliability.
You receive a utility water balance, options for recovery or operational changes, and the water-quality checks each option requires.
AI Data Centre Water & Cooling Advisory
Coolant circulating through a rack and water consumed to reject heat outdoors belong to different parts of the system. We examine both alongside local supply, IT load and hot-weather conditions. That gives site and infrastructure teams a common basis for comparing cooling options.
You receive a site water and cooling brief with peak demand scenarios, supply constraints and design questions for the engineering team.
We identify the processes a supply interruption would stop first. We review seasonal availability, storage, alternative sources, local restrictions and demand from other water users. The options reflect the catchment as well as the site boundary.
You receive a source-risk assessment, a plan for priority uses during disruption and a record of questions to take to utilities or local stakeholders.
Implementation & Performance Verification
Before a change goes ahead, we agree where to measure and which operating conditions to record. After implementation, we compare meter readings against the baseline and account for changes in production, occupancy or weather where they affect the result.
You receive an implementation brief, a meter-reading schedule with agreed thresholds for investigation, and a record that distinguishes measured changes from estimated savings.
Across industries
What does your site use water for?
Manufacturing and industrial parks
Textile mills can examine rinse-water reuse between suitable batches. Metals and chemical plants often need to segregate streams before recovery. For a multi-tenant industrial park, we map who supplies, treats and uses each stream and where responsibility changes hands.
Food, beverage and pharmaceuticals
A cleaning cycle can create a short peak that disappears in a monthly average. We match water demand to production and cleaning schedules, distinguish product-contact from utility uses, and involve the site's quality team before considering any reuse connection.
Electronics and advanced manufacturing
Different steps on the same line can require very different water quality. We compare rinse and reject streams with candidate uses, then define the sampling and quality checks needed to protect the product and the process.
AI data centres and digital infrastructure
We compare cooling options against local climate, water availability and the planned IT load. For an operating facility, we examine how peak-day makeup water and power demand change together.
Commercial estates, hospitals and institutions
On a campus, sewage treatment may produce a steady flow while irrigation demand changes with the season. We examine storage, distribution and suitable non-potable uses alongside occupancy, hygiene requirements and the facilities team's operating capacity.
Power, mining and other water-intensive sites
The starting point might be cooling demand at a generating station or the quality of recovered process water at a mine. We agree the site boundary, seasonal conditions and the uses that depend most on a reliable supply.
Who delivers the work
Aeonitya advisory
We lead the site review, develop the water balance, compare options and agree priorities with your operators. We prepare the briefs for procurement and can review performance against the baseline you approve.
Specialist delivery
Laboratory analysis, detailed engineering, equipment selection, installation and commissioning are assigned to qualified specialists within an agreed scope. At the outset we identify who is responsible for each activity and what your team will need to approve.
Discuss your water project.
Tell us where the site is, how it uses water and what you need to decide. Meter readings, a process diagram or recent water-quality results are useful if you already have them.