Site selection and expansion
Compare utility capacity, seasonal restrictions and competing demand against the planned build-out. Identify which supply commitments need written confirmation before the next phase.
Water Efficiency, Recycling & Management
How much water will the next server hall need on the hottest day of the year? We help data centre owners, developers and colocation operators compare cooling options and test whether local water supplies can support the load.

In a direct-to-chip system, coolant carries heat away from the processors. A coolant distribution unit can transfer that heat to a separate facility loop. The facility still needs somewhere to send it. A cooling tower evaporates water to release heat. A dry cooler uses outside air. Hybrid systems can switch modes as conditions change.
That last step matters when choosing a site or adding high-density racks. We compare the water and power each option needs at different outdoor temperatures and IT loads. For an existing campus, we also examine whether the current plant can serve the new hall while earlier phases stay online.
Compare utility capacity, seasonal restrictions and competing demand against the planned build-out. Identify which supply commitments need written confirmation before the next phase.
Compare dry, evaporative and hybrid heat rejection alongside the proposed rack cooling. Review peak power, available space, redundancy and the equipment supplier’s temperature limits.
Check the flow and quality of treated effluent against the facility’s cooling-tower make-up requirements. Allow for treatment, storage, blowdown disposal and an interruption to the reclaimed supply.
Reconcile incoming water with tower make-up and discharge records. Review what happens if a hot spell and a supply restriction coincide, who acts and how early they need to know.
Site water usage effectiveness (WUE) divides annual on-site water use in litres by the electricity used by IT equipment in kilowatt-hours. Power usage effectiveness (PUE) divides total facility energy by IT energy over the same period. We document the meters, the reporting period and the water sources included. Water associated with off-site electricity generation is a separate assessment.
An expanding campus can improve WUE while drawing more water overall. Alongside those ratios, we show annual volumes by source and the maximum daily supply required under each design scenario. This gives the operator and the water utility a common basis for discussing capacity.
We define the assessment boundary, review available site and utility records, prepare the water balance, compare options and take the findings through with your facilities and investment teams.
Appointed mechanical engineers and equipment manufacturers confirm detailed thermal and hydraulic designs, fluid compatibility and operating limits. Accredited laboratories test water quality. Installation and commissioning are scoped separately with your delivery team or qualified partners.
Tell us the site location, whether you are selecting a site or operating one, and the IT load you expect. If you already have a cooling concept or utility allocation, we can start there.