Renewable energy

The missing test in a second-hand solar panel offer

A used solar panel can still produce its expected watts and fail an insulation test. The difference belongs in the purchase specification.

Aeonitya Editorial

Illustrative image. A technician inspecting the back of a used photovoltaic module on a bench.
Illustrative image

A warehouse operator looking for solar panels receives a second-hand offer with unusually good paperwork. Each panel has a serial number, a photograph and a measured maximum power. The recorded watts are close to the rating on the manufacturer's label. An electrical engineer reviewing the offer asks for the insulation results. There is no column for them.

That missing column matters. In a study of decommissioned photovoltaic modules, Marco Ernst, Rabin Basnet and Christopher Fell found that some panels that passed both an electrical performance screen and an imaging screen still failed an insulation test. The owner of a building would want to know which ones. A bulk offer expressed as a quantity of saleable watts leaves that question open.

What the power curve shows

A photovoltaic module converts light into electricity. One way to examine it is to measure the current it supplies across a range of voltages under known conditions. The resulting current–voltage curve helps a specialist determine its maximum electrical power at those conditions. The curve's shape can also flag performance problems. A comparable set of measurements tells a buyer considerably more about what is in a pallet than a photograph of identical model labels.

Make a distinction in the specification between a rating assigned when the product was new and an observation made after it came out of service. Ask for the method and date behind the latter and a way to link it to the individual panel. If the figure is an estimate from the former site's generation record, keep it with the plant information. A whole array can have an excellent production year while an individual panel within it warrants further examination.

Electroluminescence imaging gives an assessor another view of the panel. Cells emit light when electrically excited under controlled conditions. A specialist can interpret patterns in the image to investigate defects, including electrically inactive areas. Insulation testing examines a different property, the ability of the insulation to restrict unwanted current. Conditions matter here too. In the 2026 IEA Photovoltaic Power Systems Programme review of second-life modules, the authors discuss damaged units that could return an acceptable insulation result when dry. A buyer should ask a competent assessor which evidence covers the conditions the panel will experience in service.

What happened to the apparently good panels?

Ernst and colleagues applied their screening approach to 3,749 decommissioned modules representing more than 100 manufacturers. They compared the results with 1,963 wet-leakage measurements and examined electroluminescence images as an additional source of information. Around 14 per cent of the modules that passed the combined power-curve and imaging screen in their comparison still failed the insulation test. The denominator is important. That figure describes a particular group which had cleared the other screens, under the researchers' chosen criteria.

An owner should resist multiplying all the panels on offer by that percentage to predict how many will fail. The useful finding concerns the independence of the questions. A more demanding power threshold can change how many units the buyer will accept on performance grounds. It does nothing to supply the missing measurement of insulation. Even with two favourable results on file, the engineer in the warehouse example still has a reason to ask for the third.

It is worth asking what the screening programme was designed to achieve. A retired owner might have commissioned a survey to explain declining generation. A trader might have sorted units by output to build consistent pallets. Both sets of records can help the assessor. Neither party was necessarily asked to establish the units' suitability for a named roof, or to give the owner of that roof any recourse. Obtain the original scope rather than guessing from the name of the test.

How the record travels with the glass

Imagine a factory with two lots of the same make and year. One was removed during straightforward repowering. The other was kept aside following damage at the old site. Once both lots arrive in the same yard, a label giving only make and year conceals the most useful difference between them. Assign each lot a separate identity before removal. Ask the assessor to record which modules received each check and whether a conclusion applies to a unit or is an inference from a sample.

Physical handover can introduce another gap. A serial number on a test report is of little use if it cannot be found on the panel. Agree how the receiver will handle a damaged pallet, an unreadable label or a unit substituted after testing. Establish who takes charge of a rejected delivery while it is still possible to choose the destination. A project that can accept equipment only on one installation day has particular reason to settle that question early.

Ask the system designer about the intended installation as well. A module with lower output might make sense as a matching spare for a specific array. An entire roof laid out around the same module presents a different decision about available area, mounting, compatibility and labour. A buyer can reasonably accept reduced power if the design allows for it. Responsibility for electrical suitability and installation still belongs with appropriately qualified specialists.

Put a boundary around the reuse claim

An owner closing its original solar site may want to report how many modules found a second use. Count separately the units removed for assessment, those accepted by a named buyer and those for which installation can be confirmed. The records accumulate at different times. Where the receiving party controls the last piece of evidence, ask for it in the agreement and allow the published figures to catch up with events.

For the warehouse, a practical closing document is an acceptance schedule that can be checked against the delivery on the floor. It connects the unit to its history, the specialist's findings, the installation for which it was accepted and the remedy for a mismatch. Keep the empty cells visible until someone qualified has filled them. The most consequential line in this purchase may be the one that never appeared in the original offer.